A builder has to pour a concrete slab 12 centimeters thick to cover an area 10 meters long and 2 meters wide. How many cubic meters of concrete will the builder need?
A
1.4 cubic meter
B
2.4 cubic meter
C
3.4 cubic meter
D
4.4 cubic meter
E
5.4 cubic meter
Correct answer: B
Explanation
Thikness= 12cm. =0.12m.
area is 10m. long and 2m. wide;
So, total concrete needed is = the volumn of the area = (0.12 * 10 * 2)= 2.4 cubic meter.